Forwards LER 98-002-00 & special rept re SG tube plugging. Special rept required by TS 4.4.5.5c since more than 1 percent of tubes inspected in SG 2-2 identified as defective by eddy current insp during Unit 2 eighth refueling outage. Forwards LER 98-002-00 & special rept re SG tube plugging. Special rept required by TS 4.4.5.5c since more than 1 percent of tubes inspected in SG 2-2 identified as defective by eddy current insp during Unit 2 eighth refueling outage.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020