LER 97-014-01:on 970415,insufficient RBCCW flow to HPSI was noted.Cause unknown.RBCCW sys supplies pump seal cooler w/ CW,providing heat removal to ultimate heat sink via SWS. W/980302 ltr. LER 97-014-01:on 970415,insufficient RBCCW flow to HPSI was noted.Cause unknown.RBCCW sys supplies pump seal cooler w/ CW,providing heat removal to ultimate heat sink via SWS. W/980302 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020