LER 98-006-00:on 980418,loss of continuous vent sampling in Unit 2 TB was noted.Caused by tubing for sample flow losing resilience.Replaced tubing on all vent monitoring sys. LER 98-006-00:on 980418,loss of continuous vent sampling in Unit 2 TB was noted.Caused by tubing for sample flow losing resilience.Replaced tubing on all vent monitoring sys.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020