LER 98-008-00:on 980407,unit operated w/PCS sys OOS & one Div RHR in suppression pool cooling.Caused by technical inaccuracies.Revised operating procedures to require that RHR sys be declared inoperable.W/980508 ltr. LER 98-008-00:on 980407,unit operated w/PCS sys OOS & one Div RHR in suppression pool cooling.Caused by technical inaccuracies.Revised operating procedures to require that RHR sys be declared inoperable.W/980508 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020