LER 98-023-00:on 980411,ESF actuation occurred at Millstone Unit 3.Caused by failure of CR operations personnel to diagnose S/G C level loss resulting from abnormal sampling blowdown lineup.Operating procedure revised. LER 98-023-00:on 980411,ESF actuation occurred at Millstone Unit 3.Caused by failure of CR operations personnel to diagnose S/G C level loss resulting from abnormal sampling blowdown lineup.Operating procedure revised.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020