LER 98-011-00:on 980409,integral attachment welds were not inspected IAW ASME Code due to deficient ISI program plan. Cause of event unknown.Byron site engineering & operation dept evaluated operability issues.W/980505 ltr. LER 98-011-00:on 980409,integral attachment welds were not inspected IAW ASME Code due to deficient ISI program plan. Cause of event unknown.Byron site engineering & operation dept evaluated operability issues.W/980505 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020