LER 98-005-00:on 980506,RPB leakage in excess of TS limit due to transverse in-core probe dry tube leakage,occurred. Caused by small leak in LPRM 16-09 assembly dry tube.Will replace LPRM Assembly 16-09 during next refueling outage. LER 98-005-00:on 980506,RPB leakage in excess of TS limit due to transverse in-core probe dry tube leakage,occurred. Caused by small leak in LPRM 16-09 assembly dry tube.Will replace LPRM Assembly 16-09 during next refueling outage.