Notice of violation from insp on 980610-0619.Violations noted:as of 980609,Procedure OT,Reactor High Level,Rev 9, did not direct or alert operators to place RFW pump breaker control switches in pull to lock to prevent start. Notice of violation from insp on 980610-0619.Violations noted:as of 980609,Procedure OT,Reactor High Level,Rev 9, did not direct or alert operators to place RFW pump breaker control switches in pull to lock to prevent start.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020