Informs that on 980530,NRC completed insp repts 50-348/98-03 & 50-364/98-03 for facility.Issue re 5 mis-wired MOVs at hot shutdown panel for unit that could have adversely impacted ability of operators to shut down plant,were examined. Informs that on 980530,NRC completed insp repts 50-348/98-03 & 50-364/98-03 for facility.Issue re 5 mis-wired MOVs at hot shutdown panel for unit that could have adversely impacted ability of operators to shut down plant,were examined.