Forwards LER 98-003-00,re inoperability of 1CF-30 during Unit 1 Cycle 12.Hydraulic actuators for all of the Unit 1 feedwater isolation valves are being replaced w/pneumatic actuators during current refueling outage. Forwards LER 98-003-00,re inoperability of 1CF-30 during Unit 1 Cycle 12.Hydraulic actuators for all of the Unit 1 feedwater isolation valves are being replaced w/pneumatic actuators during current refueling outage.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020