Jump to main content

Forwards LER 98-003-00,re inoperability of 1CF-30 during Unit 1 Cycle 12.Hydraulic actuators for all of the Unit 1 feedwater isolation valves are being replaced w/pneumatic actuators during current refueling outage. Forwards LER 98-003-00,re inoperability of 1CF-30 during Unit 1 Cycle 12.Hydraulic actuators for all of the Unit 1 feedwater isolation valves are being replaced w/pneumatic actuators during current refueling outage.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020