LER 98-020-00:on 980623,discovered previous inoperability of RCIC sys valves.Caused by initial design deficiency by misapplication or misinterpretation of design requirements. Corrected deviation in 1993.W/980723 ltr. LER 98-020-00:on 980623,discovered previous inoperability of RCIC sys valves.Caused by initial design deficiency by misapplication or misinterpretation of design requirements. Corrected deviation in 1993.W/980723 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020