Special rept:on 980611,determined that required firewatch patrol had been missed.Caused by firewatch being performed on wrong unit due to human error.Employee was verbally counseled on firewatches & documentation was corrected. Special rept:on 980611,determined that required firewatch patrol had been missed.Caused by firewatch being performed on wrong unit due to human error.Employee was verbally counseled on firewatches & documentation was corrected.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020