LER 98-003-00:on 980113,refueling water tank level channel failure was noted.Caused by water intrusion into electrical termination pull box.Weep holes were drilled into bottoms of pull boxes nearest level transmitters in all four channels. LER 98-003-00:on 980113,refueling water tank level channel failure was noted.Caused by water intrusion into electrical termination pull box.Weep holes were drilled into bottoms of pull boxes nearest level transmitters in all four channels.