LER 97-025-01:on 971123,completion of required shutdown was noted due to two inoperable MSIVs.Cause of failure of vessel flange thermocouples could not be conclusively determined. RV flange thermocouples will be restored. LER 97-025-01:on 971123,completion of required shutdown was noted due to two inoperable MSIVs.Cause of failure of vessel flange thermocouples could not be conclusively determined. RV flange thermocouples will be restored.