LER 98-010-00:on 980714,determined that leakage from boron injection tank exceeded max allowable ECCS leakage from sources outside containment.Caused by leaking 2SJ404 manual sample valve.2SJ404 valve repaired.W/980813 ltr. LER 98-010-00:on 980714,determined that leakage from boron injection tank exceeded max allowable ECCS leakage from sources outside containment.Caused by leaking 2SJ404 manual sample valve.2SJ404 valve repaired.W/980813 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020