PNO-I-95-004:on 950126,licensee determined that containment sump recirculation valves could experience locking during design of basis LOCA & fail in closed position.Unit 2 in cold shutdown condition & mod to valves are considered. PNO-I-95-004:on 950126,licensee determined that containment sump recirculation valves could experience locking during design of basis LOCA & fail in closed position.Unit 2 in cold shutdown condition & mod to valves are considered.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020