LER 96-014-01:on 961124,Class 1E Raychem cable splices were installed incorrectly.Caused by inadequate procedure.Splices were either confirmed to be acceptable by field insp or were replaced w/correctly installed splices. LER 96-014-01:on 961124,Class 1E Raychem cable splices were installed incorrectly.Caused by inadequate procedure.Splices were either confirmed to be acceptable by field insp or were replaced w/correctly installed splices.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020