Amend 102 to license DPR-22,changing maximum reactor core thermal power level specified in license from 1670 MWt to 1775 MWt. Amend 102 to license DPR-22,changing maximum reactor core thermal power level specified in license from 1670 MWt to 1775 MWt.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020