Jump to main content

Announces plans to conduct SSEI at BFNP on 981116-20 & 981130-1204.Insp objective will be to evaluate capability of high pressure coolant injection sys to perform safety functions required by design basis. Announces plans to conduct SSEI at BFNP on 981116-20 & 981130-1204.Insp objective will be to evaluate capability of high pressure coolant injection sys to perform safety functions required by design basis.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020