Proposed tech specs,lowering power level below which TCV & TSV closure scram signals & EOC-RPT signal are not in effect. Proposed tech specs,lowering power level below which TCV & TSV closure scram signals & EOC-RPT signal are not in effect.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020