LER 95-001-00:on 950105,FW heater train operation during removal of FW heater from svc was not understood & resulted in decreased FW temp,loss of heater level control & manual scram.Plugged 5B FW heater tubes.W/950203 ltr. LER 95-001-00:on 950105,FW heater train operation during removal of FW heater from svc was not understood & resulted in decreased FW temp,loss of heater level control & manual scram.Plugged 5B FW heater tubes.W/950203 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020