Responds to 980929 ltr to H Miller re core shroud at Nine Mile Point Nuclear Station.Approval of utility proposal not to perform mid-cycle reinspection of NMP Unit 1 core shroud based upon significant engineering evaluations. Responds to 980929 ltr to H Miller re core shroud at Nine Mile Point Nuclear Station.Approval of utility proposal not to perform mid-cycle reinspection of NMP Unit 1 core shroud based upon significant engineering evaluations.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020