LER 98-046-00:on 981226,manual reactor trip was initiated due to difference in indicated & demand rod positions.Caused by degradation of main board rod bank selector switch. Replacement of switch was peformed prior to restarting unit. LER 98-046-00:on 981226,manual reactor trip was initiated due to difference in indicated & demand rod positions.Caused by degradation of main board rod bank selector switch. Replacement of switch was peformed prior to restarting unit.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020