Submits response to NRC RAI re verification that sufficient NPSH ECCS pumps remains available with proposed rev of RWST low-low level setpoint,as proposed in LAR 97-07. Marked-up engineering calculations encl. Submits response to NRC RAI re verification that sufficient NPSH ECCS pumps remains available with proposed rev of RWST low-low level setpoint,as proposed in LAR 97-07. Marked-up engineering calculations encl.