Jump to main content

LER 99-001-00:on 990211,EDG output breaker failed to remain closed during surveillance testing.Caused by breaker control switch failing to react quickly.Modified closing circuit for EDG output. LER 99-001-00:on 990211,EDG output breaker failed to remain closed during surveillance testing.Caused by breaker control switch failing to react quickly.Modified closing circuit for EDG output.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020