LER 99-003-00:on 990215,SRV setpoint drift was discovered. Caused by corrosion bonding between SRV pilot disc & seat. All SRV pilot assemblies will be tested & replaced each operating cycle. LER 99-003-00:on 990215,SRV setpoint drift was discovered. Caused by corrosion bonding between SRV pilot disc & seat. All SRV pilot assemblies will be tested & replaced each operating cycle.