Special rept 99-01:on 990128,DG tripped after 2 h of operation during loaded operation for monthly test.Caused by several components that were degraded or had intermittent problems.Parts were replaced & initial run was performed. Special rept 99-01:on 990128,DG tripped after 2 h of operation during loaded operation for monthly test.Caused by several components that were degraded or had intermittent problems.Parts were replaced & initial run was performed.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020