Jump to main content

Submits ISI summary rept for CP&L HNP.Rept covers insps performed at HNP during Cycle 8 operations,including Refueling Outage 8 in second 10-yr ISI interval. Submits ISI summary rept for CP&L HNP.Rept covers insps performed at HNP during Cycle 8 operations,including Refueling Outage 8 in second 10-yr ISI interval.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020