Submits ISI summary rept for CP&L HNP.Rept covers insps performed at HNP during Cycle 8 operations,including Refueling Outage 8 in second 10-yr ISI interval. Submits ISI summary rept for CP&L HNP.Rept covers insps performed at HNP during Cycle 8 operations,including Refueling Outage 8 in second 10-yr ISI interval.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020