Jump to main content

Amended Part 21 rept re Cooper-Bessemer KSV EDG power piston failure.Total of 198 or more pistons have been measured at seven different sites.All potentially defective pistons have been removed from svc based on encl results. Amended Part 21 rept re Cooper-Bessemer KSV EDG power piston failure.Total of 198 or more pistons have been measured at seven different sites.All potentially defective pistons have been removed from svc based on encl results.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020