Forwards data sheets for concrete slab from former thorium processing bldg (Bldg 31) at Cushing refinery site in accordance with NRC request.Data shows that concrete floor was surveyed in 1991.Attached pages of data present results. Forwards data sheets for concrete slab from former thorium processing bldg (Bldg 31) at Cushing refinery site in accordance with NRC request.Data shows that concrete floor was surveyed in 1991.Attached pages of data present results.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020