LER 99-002-00:on 990317,identified problem associated with ability to establish flow pressure LPI discharge headers within 15 minutes.Caused by inadequate validation process. Engineering analysis performed.With 990415 ltr. LER 99-002-00:on 990317,identified problem associated with ability to establish flow pressure LPI discharge headers within 15 minutes.Caused by inadequate validation process. Engineering analysis performed.With 990415 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020