Special rept 99-03:on 990227,failure of EDG 1-1 to stabilize at 4160 +240/-375 volts within 13 seconds,occurred.Cause not determined. "Field Flash Cutout Relay" (K3-11) was replaced & diesel subsequently tested satisfactorily. Special rept 99-03:on 990227,failure of EDG 1-1 to stabilize at 4160 +240/-375 volts within 13 seconds,occurred.Cause not determined. "Field Flash Cutout Relay" (K3-11) was replaced & diesel subsequently tested satisfactorily.