LER 99-001-01:on 990114,incorrect EDG line-up during fire placed plant in condition outside design basis.Caused by inadequate procedures & insufficient operator training. Revised EDG operating & surveillance test procedures. LER 99-001-01:on 990114,incorrect EDG line-up during fire placed plant in condition outside design basis.Caused by inadequate procedures & insufficient operator training. Revised EDG operating & surveillance test procedures.