Part 21 interim rept (SSH 99-0001) re 990218 failure of circuit breaker located in cubicle 14 of XSW1DB to close during surveillance testing.Caused by positive interlock angle was incorrect.Breaker was returned to GE factory. Part 21 interim rept (SSH 99-0001) re 990218 failure of circuit breaker located in cubicle 14 of XSW1DB to close during surveillance testing.Caused by positive interlock angle was incorrect.Breaker was returned to GE factory.