Jump to main content

Part 21 interim rept (SSH 99-0001) re 990218 failure of circuit breaker located in cubicle 14 of XSW1DB to close during surveillance testing.Caused by positive interlock angle was incorrect.Breaker was returned to GE factory. Part 21 interim rept (SSH 99-0001) re 990218 failure of circuit breaker located in cubicle 14 of XSW1DB to close during surveillance testing.Caused by positive interlock angle was incorrect.Breaker was returned to GE factory.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020