Jump to main content

LER 99-004-00:on 990312,inadequate basis for seismic instrument setpoints & calibration led to TS noncompliance. Caused by discrepancy in TSs.Noncompliances were corrected & appropriate procedures were revised.With 990412 ltr. LER 99-004-00:on 990312,inadequate basis for seismic instrument setpoints & calibration led to TS noncompliance. Caused by discrepancy in TSs.Noncompliances were corrected & appropriate procedures were revised.With 990412 ltr.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020