Summary of 990427 telcon with util re recent secondary side SG insp activities at plant,Unit 2.Replacement SGs are planned to be installed in spring 2002 for Units 1 & 2. Summary of 990427 telcon with util re recent secondary side SG insp activities at plant,Unit 2.Replacement SGs are planned to be installed in spring 2002 for Units 1 & 2.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020