LER 95-004-00:on 950207,102 percent RTP potentially exceeded due to spurious reactor recirculation pumps speed run-up. Improved design potentiometer will be installed in Units 2 & 3 reactor recirculation control circuitry.W/950302 ltr. LER 95-004-00:on 950207,102 percent RTP potentially exceeded due to spurious reactor recirculation pumps speed run-up. Improved design potentiometer will be installed in Units 2 & 3 reactor recirculation control circuitry.W/950302 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020