PNO-I-99-035:on 990724,Calvert Cliffs,Unit 1 automatically shutdown from 100% power.All control rods fully inserted & all safety equipment operated as designed during & following shutdown.Licensee plans to replace "A" phase bushing. PNO-I-99-035:on 990724,Calvert Cliffs,Unit 1 automatically shutdown from 100% power.All control rods fully inserted & all safety equipment operated as designed during & following shutdown.Licensee plans to replace "A" phase bushing.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020