Proposed tech specs increasing AOT for CRAC from 30 days to 60 days on one time basis for each train to facilitate on- line implementation of design enhancements during current operating cycle. Proposed tech specs increasing AOT for CRAC from 30 days to 60 days on one time basis for each train to facilitate on- line implementation of design enhancements during current operating cycle.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020