Jump to main content

Interim Part 21 Rept (File 94-12) re Limitorque actuator potential motor pinion key (MPK) failure.Addl testing being conducted of KALSI configuration w/set screw removed to determine criticality of step in MPK installation process. Interim Part 21 Rept (File 94-12) re Limitorque actuator potential motor pinion key (MPK) failure.Addl testing being conducted of KALSI configuration w/set screw removed to determine criticality of step in MPK installation process.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020