LER 95-007-00:on 950511,SRV tested at Wyle Labs exceeded TS setpoint limits.Caused by O induced pilot disc-to-seat bonding.Replaced SRV pilot valve assemblies w/certified spares prior to startup of Unit 1. LER 95-007-00:on 950511,SRV tested at Wyle Labs exceeded TS setpoint limits.Caused by O induced pilot disc-to-seat bonding.Replaced SRV pilot valve assemblies w/certified spares prior to startup of Unit 1.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020