LER 95-009-00:on 950503,HPCS DG & HPCS pump initiation occurred due to procedural deficiency.HPCS pump was secured after verification that actual RV water level was not low. W/950602 ltr. LER 95-009-00:on 950503,HPCS DG & HPCS pump initiation occurred due to procedural deficiency.HPCS pump was secured after verification that actual RV water level was not low. W/950602 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020