Jump to main content

LER 94-004-02:on 941006,Train A declared inoperable due to projection of test results indicated battery banks did not meet 90% criteria of TS SR 4.8.2.1.e.Caused by loss of positive active matl.Proposed TS amend submitted. LER 94-004-02:on 941006,Train A declared inoperable due to projection of test results indicated battery banks did not meet 90% criteria of TS SR 4.8.2.1.e.Caused by loss of positive active matl.Proposed TS amend submitted.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020