LER 94-004-02:on 941006,Train A declared inoperable due to projection of test results indicated battery banks did not meet 90% criteria of TS SR 4.8.2.1.e.Caused by loss of positive active matl.Proposed TS amend submitted. LER 94-004-02:on 941006,Train A declared inoperable due to projection of test results indicated battery banks did not meet 90% criteria of TS SR 4.8.2.1.e.Caused by loss of positive active matl.Proposed TS amend submitted.