Responds to NRC 940928 ltr re violations noted in insp rept 50-219/94-14.Corrective actions:unisolate HCU,return to full operability & control rod 06-19 was driven to fully inserted position. Responds to NRC 940928 ltr re violations noted in insp rept 50-219/94-14.Corrective actions:unisolate HCU,return to full operability & control rod 06-19 was driven to fully inserted position.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020