Special rept:on 950806 & 7,two failures of EDG 1-2 to achieve rated output frequency within TS time limits due to degraded electronic governor performance.Motor-operated potentiometer & electronic governor replaced. Special rept:on 950806 & 7,two failures of EDG 1-2 to achieve rated output frequency within TS time limits due to degraded electronic governor performance.Motor-operated potentiometer & electronic governor replaced.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020