Informs that code repair on main steam drain line was completed on 950827.Repair replaced piping from main steam header sockolet connection up to & including degraded elbow. Informs that code repair on main steam drain line was completed on 950827.Repair replaced piping from main steam header sockolet connection up to & including degraded elbow.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020