LER 95-005-00:on 950226,discovered that TS SR 4.2.4a, quadrant power tilt ratio calculation not performed due to personnel error.Operator counseled & surveillance verification log will be further factored.W/950901 ltr. LER 95-005-00:on 950226,discovered that TS SR 4.2.4a, quadrant power tilt ratio calculation not performed due to personnel error.Operator counseled & surveillance verification log will be further factored.W/950901 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020