Jump to main content

Informs that IST program relief VRR-21 no longer required & formally withdrawn.Future testing of main feedwater check valve shall be on cold shutdown frequency as permitted by ASME Section XI,IWV-3522. Informs that IST program relief VRR-21 no longer required & formally withdrawn.Future testing of main feedwater check valve shall be on cold shutdown frequency as permitted by ASME Section XI,IWV-3522.

Meta Data

Data source

Japan Atomic Energy Agency's Library Catalog

A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.

December 31, 2020