Provides response to Insp Rept 50-255/95-08 re control of mobile cranes.Corrective actions:permanent guy wire installed on leaning pole,permitted cables to sag. Provides response to Insp Rept 50-255/95-08 re control of mobile cranes.Corrective actions:permanent guy wire installed on leaning pole,permitted cables to sag.