LER 95-014-00:on 950816,reactor scram occurred due to 1D RPS trip causing Group 1 isolation.Upgrade model of EPM assembly logic cards installed on both Unit 1 RPS motor generator sets & upper main steam tunnel switches calib.W/950915 ltr. LER 95-014-00:on 950816,reactor scram occurred due to 1D RPS trip causing Group 1 isolation.Upgrade model of EPM assembly logic cards installed on both Unit 1 RPS motor generator sets & upper main steam tunnel switches calib.W/950915 ltr.
Data source
Japan Atomic Energy Agency's Library Catalog
A search system for the collections of the Japan Atomic Energy Agency central library. Books, reports, meeting materials, magazines and dockets collected by the library are searchable.
Last updated
December 31, 2020